Posts
All the articles I've posted.
-
Construct to Create
From EA’s Adventure Construction Set to UI Stencils and Maschine—how modular “construction sets” unlock faster creative output.
-
The Project Survival Kit
Three survival-grade PM ingredients—end-state narrative, strengths-aware teaming, and crystal-clear org charts—before timelines and risk logs.
-
Work Progress.
Summer 2010 progress notes—Big Generator’s redesign and content split, print and digital portfolios, Basic Maths theme, and Cintiq work.
-
Recalibration III.
Five checkpoints that keep goals, pathways, motivators, and eventual self-powered momentum from drifting out of sync.
-
Recalibration II.
Motivation is not always healthy—chasing the wrong goal (more school) delayed launching Big Generator until the mismatch was named.
-
Recalibration I.
Atlantic reading on jobless eras and Twenge’s Generation Me reframes my 2010 growth around perseverance, not empty confidence.